Unusable Allowance
Component allowance for automated surface mount feeding accounts for unpicked devices lost during strip loading and feeder indexing. Manufacturing planning incorporates cut tape attrition to calculate the minimum component overage required when surface mount devices arrive in short tape strips rather than full reels. This scrap allowance occurs because pick and place machine feeders require a minimum tape leader length for sprocket drive wheels to engage, leaving initial component pockets inaccessible to vacuum nozzle heads.
The loss metric governs inventory planning during surface mount assembly and stops applying once carrier tape feeds continuously from a standard reel.
Loader Mechanism
Sprocket teeth advance carrier tape across a fixed indexing distance before the first component pocket reaches the pick point. Cover tape must peel away cleanly and attach to a drive spool, requiring sacrificial tape length to prevent exposed components from dropping out during threading.
Procurement Calculation
Enterprise resource planning software adjusts work order component quantities based on sub-assembly lot size and strip length. For a prototype build requiring fifty components delivered across two cut tape segments, an attrition allowance of ten components per strip increases required procurement to seventy units. This adjustment represents a forty percent component overage for small lot builds.
Higher production runs reduce this relative overhead by distributing the fixed strip loss across full continuous reels containing thousands of units. Component verification systems record cut tape attrition during kitting to confirm that line shortages arise from mechanical setup scrap rather than vendor reel miscounts.