Contractual Protection
Legal provisions in supply agreements establish specific remedies when a defect appears across a large portion of a product population. The epidemic failure clause defines the percentage of units that must fail before a systemic issue is acknowledged. Contractual protection ensures that the buyer is not left with the cost of a mass-produced error.
Triggering Threshold
Activation of these protections depends on reaching a predefined failure rate within a set time period. While a standard epidemic failure clause might trigger at three percent, the specific number is negotiated based on the complexity and expected reliability of the circuit board assembly. Detailed failure analysis determines whether the root cause is a manufacturing error or a design flaw.
If the defect is found to be systemic, the supplier must provide a recovery plan for all affected units.
Remediation Obligation
Recovery actions often include the repair or replacement of the entire installed base rather than just the failed units. Costs associated with logistics and labor fall under the obligations defined by the epidemic failure clause. Accurate tracking of serial numbers and batch codes facilitates the targeted recall of suspected lots.
Effective clauses prevent a single manufacturing excursion from bankrupting the purchasing entity.