Production Rate
Duration of the manufacturing process from the entry of the first component to the completion of the final assembly defines the speed of a production environment. Line cycle time measures the interval between successive finished boards exiting the surface mount technology line. This metric dictates the total output of the factory floor for a given shift.
It stops being the primary driver of cost when the setup times for small batches exceed the actual run times.
Bottleneck Identification
Calculation of this value identifies which machine in the sequence limits the overall pace of the line. Because the line cycle time is determined by the slowest process, often the chip mounter or the reflow oven, balancing the workload is a requirement for efficiency. If the solder paste printer takes twenty seconds but the placement machine takes forty seconds, the printer will remain idle for half its life.
Adjusting the feeder locations or nozzle changes can reduce these delays. Advanced software simulations analyze the bill of materials to find the most efficient placement order. This analysis considers the travel distance of the placement head and the time required for tool swaps.
Even a reduction of one second per board translates to hundreds of additional units per day in high volume environments.
Capacity Calculation
Optimization of the sequence reduces the time a board spends at each station. A short line cycle time increases the return on capital for the equipment. Continuous operation is possible without frequent manual recalibration.