Control Milestone
Procedural requirement that must be satisfied before a production lot or a new board design moves to the next manufacturing stage. Quality management systems use qualification gating to prevent the accumulation of scrap by catching defects early in the cycle. Each gate acts as a formal review point where data from inspections and tests are evaluated.
Checkpoints are integrated into the enterprise resource planning system to ensure no batch bypasses the required checks. The gate acts as a barrier that only opens when the specific performance metrics of the previous step are verified.
Quality Assurance
Failure at any checkpoint stops the work flow until the root cause of the deviation is identified and corrected. First article inspections often act as the primary qualification gating for new assembly lines. Verification steps include checking component orientation, solder paste volume, stencil alignment, and thermal profile accuracy.
Economic Boundary
Preventing the addition of value to a defective part is the main financial driver behind this methodology. Scrapping a bare board after a failed etching gate is far less expensive than discarding a fully populated assembly after final test. Rigid gate controls ensure that only conforming materials consume machine time and labor.