Acceptance Decision
Statistical quality control criteria dictate the formal non-acceptance of an entire manufacturing batch when sample inspection reveals non-conformances exceeding pre-established limits. Executing a lot rejection halts the entry of sub-standard printed circuit boards into downstream surface mount assembly lines. Standardized sampling protocols such as IPC-6012 and ANSI/ASQ Z1.4 define the defect thresholds that trigger batch return to the fabrication facility.
Defect Threshold
Defect severity classifications separate minor cosmetic variations from critical functional non-conformances that compromise assembly reliability. When automated optical inspection or microsection analysis discovers a single critical defect, such as barrel cracking or inner-layer separation in a zero-defect acceptance plan, lot rejection becomes mandatory under standard commercial contracts. Non-critical defects follow acceptable quality limit tables where a calculated percentage of allowable variance is permitted across the sample size before the batch fails inspection.
Fabricators receiving rejected lots must conduct root-cause analysis, document corrective actions, and submit re-inspection plans prior to presenting a resubmitted batch. Traceability requirements enforce strict segregation of quarantined batches to prevent mixing non-conforming circuit panels with approved inventory.
Disposition Protocol
Material review boards evaluate rejected production runs to determine whether scrap, rework, or concession approval applies. Rework procedures must comply with IPC-7711 standards to ensure modified assemblies retain original structural integrity. Concession approvals require written authorization from the purchasing entity before conditional release occurs.