Sequential Build
Advanced circuit board fabrication involves repeated cycles of heat and pressure to bond layers in stages. Complex designs with buried or blind vias require multi-press lamination to build the stack from the inside out. Each press cycle cures a specific set of core and prepreg layers before more copper is added.
This sequence allows for electrical connections to be drilled and plated before they are covered by subsequent layers.
Layer Registration
Precision alignment of internal features becomes more difficult with each additional cycle. During multi-press lamination, the substrate undergoes dimensional changes as the resin flows and the copper expands under intense heat. Fabricators use specialized tooling and optical targets to track the movement of the inner layers relative to the global coordinates.
Scaling factors are adjusted for every cycle to compensate for the shrinkage that occurs during the cooling phase. If these shifts are not managed, the laser drills will miss the landing pads of the buried vias, resulting in an open circuit.
Dielectric Stress
Dielectric thickness control is a major challenge during these multiple cycles. Each press event compresses the prepreg layers differently based on the surrounding copper density. Fabricators monitor the final board thickness at several points to verify the impedance values of the critical traces stay within the ten percent tolerance allowed by the customer.