Decision Logic
Criteria governing the disposal or return of an entire production lot determine the threshold at which individual defects indicate a systemic process failure. These batch rejection rules prevent the acceptance of groups where the risk of latent failure exceeds the permissible limit. They define the exact number of non-conforming units allowed before the whole shipment is deemed non-compliant.
High defect rates usually signify a loss of control on the manufacturing floor.
Statistical Application
Sampling plans often follow international standards to establish confidence in the quality of the uninspected units. If the count of critical defects found in a random sample meets the reject number, the batch rejection rules trigger an automatic failure of the lot. This mechanism protects the buyer from receiving parts with a high statistical probability of failure.
Process Feedback
Immediate notification of a lot failure allows the fabrication line to pause and investigate the root cause of the shift. A high rate of rejection leads to a mandatory review of the manufacturing parameters. Corrective actions must be documented before the supplier can resume production of the affected part number.
This process ensures that systemic issues are caught before they impact the final assembly yields. Detailed failure analysis reports are typically required to justify the restart of the line.